What a resource-efficiency assessment looks at

Programmes like SAVE send engineers into factories to find where energy, water and materials are wasted, then help the factory fix the biggest items first.

Typical areas

AreaTypical measures
Steam and heatRecover waste heat from engines and boilers, return condensate, insulate pipes
WaterReuse rinse water, meter each process, cut water per kilogram of fabric
ElectricityEfficient motors and lighting, compressed-air leak repair
ChemicalsRestricted substances lists and better dosing
PeopleTraining staff to keep the savings going

Published examples from PUMA's supply chain

FactoryMeasureResult
Shenzhou International, Ningbo (China)Six-step environmental improvement plan7.7% less energy, about 10% less CO2, 13% less water
Square Fashion Limited (Bangladesh)Waste-heat recovery boiler (5.7 tonnes of steam per hour) on gas-engine exhaustMore than 2 million m³ of natural gas and 4,354 tonnes CO2e saved per year

These later results come from PUMA's own reporting on supplier programmes such as Clean by Design (with the Apparel Impact Institute in China) and the IFC-led Partnership for Cleaner Textiles in Bangladesh, which continued the kind of work SAVE started.

  1. PUMA CATch up: How PUMA makes the factories in its supply chain more sustainable